What is the future for the park?
Up to Table of Contents
The entire park is set to grow the length of the shoreline and be over a mile and a half long as outlined in the master plan.
The next phase of the park will be the peninsula park area. There are pictures of the construction in the picture gallery (see link) as well as discussion in the Gantry Park discussion board.