EastCoast
Up to EastCoastThe original Rockrose development is now split into two with TF Cornerstone being the developer of six out of seven buildings on the old 22 acre Pepsi Plant site which will be called EastCoast.
There will be over 3,300 new apartments built on about 22 acres with a mix of rental and condos. Rockrose bought the land for $20 million but transferred the ownership over to the Queens West Development Corp, which is leases it back for a $1 a year.
EastCoast Resources
- QueensWest.com Neighborhood discussion board
- Hundreds of EastCoast photos
- Local weather in Queens West & Long Island City
- Local classifieds
- The LIC local business directory
- Official website at (www.eastcoastlic.com)
East Coast Buildings
4615 Center Blvd
Units: 367
Opening: March 2012
4720 Center Blvd
Units: 498
Currently open and 99% leased
4610 Center Blvd
Units: 585
Completion: 2012
4540 Center Blvd
Units: 345
Completion: 2013
4545 Center Blvd
Units: 820
Completion: 2013
The View Condominium
4630 Center Blvd
Units: 184
Currently over 70% sold
4720 Center Boulevard (East Coast Tower I)
- 47-20 Center Boulevard/Queens West Parcel 6
- 31 stories 299 feet (DOB)
- Designed by Arquitectonica/SLCE
- 650 units 477,246 Sq. Ft.
- Under Construction 2005 to late 2006
- Occupancy started in July 2006
- No garage
- Large variety of spacious layouts, some duplexes
- Floor to ceiling windows
- Luxury bath and kitchen features
- High tech smart wiring
- Many with walk-in closets and washer/dryers in 3 bedroom apartments
- Many with private outdoor space (garden, balcony, or roof terrace)
- Washer / Dryer in 3 bedroom apts, laundry on every floor (2 W/D carded units)
- Free gym in building but with no studio or classes
4710 Center Blvd- (East Coast Tower II)
- 47-10 5th Street/ 4-50 4-88 47th Avenue / Queens West Parcel 7
- 30 story (316 feet) rental residential building
- Designed by Arquitectonica/SLCE
- Dev-Rockrose Development Corporation (East Coast 7 LLC)
- 395 units 698,688 Sq. Ft.
- Under Construction Late 2005-2007
- Retail space to include 20-30,000 sq. ft. supermarket
- Slotted to have a Duane Reade pharmacy
- Fitness club with indoor lap pool
- 900 car garage to be run by a separate parking company with valet
The View
- 20 story condo residential building
- Designed by Arquitectonica/SLCE
- Anticipated completion 2008
- 200 apartments, some retail
- Private desks and outdoor space
- Started in March 2007
History of EastCoast
- EastCoast Tower II was started Spring of 2006
- 4720 Center Blvd completed 2006 with occupancy in August of 2006
- The first three buildings were designed by Arquitectonica
- Rockrose splits into TF Cornerstone which held 6 of the 7 buildings